Cost Breakdown
Name/Model: Viper (Black Python) 5
Technology: Clan
Tonnage: 75
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous): (211 pts) 11.0 x 20,000 220,000.00
Internal Structure (Endo Steel): 75 x 1,600 x 1 (+) 120,000.00 = 340,000.00
Myomer (Standard): 75 x 2,000 (+) 150,000.00 = 490,000.00
Engine (XL): (20,000 x 375 x 75) / 75 (+) 7,500,000.00 = 7,990,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 9,190,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 9,390,000.00
Life Support: 50,000 (+) 50,000.00 = 9,440,000.00
Sensors: 75 x 2,000 (+) 150,000.00 = 9,590,000.00
Heat Sinks (Double): 11 x 6,000 (+) 66,000.00 = 9,656,000.00
Arm Actuators: 75 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 34,500.00 = 9,690,500.00
Leg Actuators: 75 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 52,500.00 = 9,743,000.00
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 9,743,000.00
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
ER PPC 300,000 (+) 300,000.00 = 400,000.00
ER PPC 300,000 (+) 300,000.00 = 700,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 1,000,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
Jump Jets 75 x (5 x 5) x 200 (+) 375,000.00 = 1,375,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,380,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,385,000.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 1,385,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,385,000.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 9,743,000.00
Weapons and Equipment Cost: (+) 1,385,000.00 = 11,128,000.00
BattleMech Cost Multiplier: 1 + (75 / 100) (*) 1.75 = 19,474,000.00
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 19,474,000.00
|