Cost Breakdown
Name/Model: Peacekeeper PKP-1B
Technology: Inner Sphere
Tonnage: 95
Configuration: Biped BattleMech
========================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------
Armor (Light Ferro-Fibrous): (293 pts) 17.5 x 15,000 262,500.00
Internal Structure (Endo Steel): 95 x 1,600 x 1 (+) 152,000.00 = 414,500.00
Myomer (Triple-Strength): 95 x 16,000 (+) 1,520,000.00 = 1,934,500.00
Engine (XL): (20,000 x 380 x 95) / 75 (+) 9,626,666.67 = 11,561,166.67
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 12,761,166.67
Cockpit (Standard): 200,000 (+) 200,000.00 = 12,961,166.67
Life Support: 50,000 (+) 50,000.00 = 13,011,166.67
Sensors: 95 x 2,000 (+) 190,000.00 = 13,201,166.67
Heat Sinks (Double): 15 x 6,000 (+) 90,000.00 = 13,291,166.67
Arm Actuators: 95 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 19,000.00 = 13,310,166.67
Leg Actuators: 95 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 66,500.00 = 13,376,666.67
------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 13,376,666.67
========================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER Large Laser 200,000 (+) 200,000.00 = 450,000.00
Heavy PPC 250,000 (+) 250,000.00 = 700,000.00
Heavy PPC 250,000 (+) 250,000.00 = 950,000.00
Jump Jets 95 x (3 x 3) x 200 (+) 171,000.00 = 1,121,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 1,381,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,381,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,381,000.00
------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,381,000.00
========================================================================================================================
BattleMech Cost
------------------------------------------------------------------------------------------------------------------------
Structural Cost: 13,376,666.67
Weapons and Equipment Cost: (+) 1,381,000.00 = 14,757,666.67
BattleMech Cost Multiplier: 1 + (95 / 100) (*) 1.95 = 28,777,450.00
------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 28,777,450.00
|