Cost Breakdown
Name/Model: Hitotsume Kozo HKZ-1FM (Mulan)
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped BattleMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Standard): (152 pts) 9.5 x 10,000 95,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 183,000.00
Myomer (Triple-Strength): 55 x 16,000 (+) 880,000.00 = 1,063,000.00
Engine (XL): (20,000 x 330 x 55) / 75 (+) 4,840,000.00 = 5,903,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 7,103,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,303,000.00
Life Support: 50,000 (+) 50,000.00 = 7,353,000.00
Sensors: 55 x 2,000 (+) 110,000.00 = 7,463,000.00
Heat Sinks (Double): 12 x 6,000 (+) 72,000.00 = 7,535,000.00
Arm Actuators: 55 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 25,300.00 = 7,560,300.00
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 7,598,800.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,598,800.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Medium Laser 80,000 80,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 160,000.00
Heavy PPC 250,000 (+) 250,000.00 = 410,000.00
Jump Jets 55 x (4 x 4) x 200 (+) 176,000.00 = 586,000.00
Large Vibroblade 750,000 (+) 750,000.00 = 1,336,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,336,000.00
=====================================================================================================================
BattleMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,598,800.00
Weapons and Equipment Cost: (+) 1,336,000.00 = 8,934,800.00
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 13,848,940.00
---------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 13,848,940.00
|