Cost Breakdown
Name/Model: Men Shen MS1-OA
Technology: Inner Sphere
Tonnage: 55
Configuration: Biped OmniMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
Armor (Standard): (176 pts) 11.0 x 10,000 110,000.00
Internal Structure (Endo Steel): 55 x 1,600 x 1 (+) 88,000.00 = 198,000.00
Myomer (MASC): (330 x 3 x 1,000) + (55 x 2,000) (+) 1,100,000.00 = 1,298,000.00
Engine (XL): (20,000 x 330 x 55) / 75 (+) 4,840,000.00 = 6,138,000.00
Gyro (Standard): 4.0 x 300,000 (+) 1,200,000.00 = 7,338,000.00
Cockpit (Standard): 200,000 (+) 200,000.00 = 7,538,000.00
Life Support: 50,000 (+) 50,000.00 = 7,588,000.00
Sensors: 55 x 2,000 (+) 110,000.00 = 7,698,000.00
Heat Sinks (Double): 10 x 6,000 (+) 60,000.00 = 7,758,000.00
Arm Actuators: 55 x ((100 x 2) + (50 x 0) + (80 x 0)) (+) 11,000.00 = 7,769,000.00
Leg Actuators: 55 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 38,500.00 = 7,807,500.00
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 7,807,500.00
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
Beagle Active Probe 200,000 200,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 280,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 360,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 440,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 840,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 840,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 840,000.00
TAG 50,000 (+) 50,000.00 = 890,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 890,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
Structural Cost: 7,807,500.00
Weapons and Equipment Cost: (+) 890,000.00 = 8,697,500.00
OmniMech Conversion Cost: (7,807,500.00 + 890,000.00) x 0.25 (+) 2,174,375.00 = 10,871,875.00
BattleMech Cost Multiplier: 1 + (55 / 100) (*) 1.55 = 16,851,406.25
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost 16,851,406.00
|