|                  Cost Breakdown
Name/Model:         Dragoon AEM-00
Technology:         Inner Sphere
Tonnage:            70
Configuration:      Biped BattleMech
================================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------------------
  Armor (Standard):                           (216 pts) 13.5 x 10,000                             135,000.00                    
  Internal Structure (Standard):              70 x 400 x 1                             (+)         28,000.00  =       163,000.00
  Myomer (Standard):                          70 x 2,000                               (+)        140,000.00  =       303,000.00
  Engine (Fusion):                            (5,000 x 280 x 70) / 75                  (+)      1,306,666.67  =     1,609,666.67
  Gyro (Standard):                            3.0 x 300,000                            (+)        900,000.00  =     2,509,666.67
  Cockpit (Standard):                         200,000                                  (+)        200,000.00  =     2,709,666.67
  Life Support:                               50,000                                   (+)         50,000.00  =     2,759,666.67
  Sensors:                                    70 x 2,000                               (+)        140,000.00  =     2,899,666.67
  Heat Sinks (Double):                        11 x 6,000                               (+)         66,000.00  =     2,965,666.67
  Arm Actuators:                              70 x ((100 x 2) + (50 x 0) + (80 x 0))   (+)         14,000.00  =     2,979,666.67
  Leg Actuators:                              70 x ((150 x 2) + (80 x 2) + (120 x 2))  (+)         49,000.00  =     3,028,666.67
--------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost:                                                                                              3,028,666.67
================================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------------------
  Guardian ECM Suite                          200,000                                             200,000.00                    
  LB 10-X AC                                  400,000                                  (+)        400,000.00  =       600,000.00
  LB 10-X AC (Ammo 10) [Cluster] [Empty Bin]  0                                        (+)              0.00  =       600,000.00
  LB 10-X AC (Ammo 10) [Empty Bin]            0                                        (+)              0.00  =       600,000.00
  LB 10-X AC (Ammo 10) [Empty Bin]            0                                        (+)              0.00  =       600,000.00
  PPC                                         200,000                                  (+)        200,000.00  =       800,000.00
  SRM 6                                       80,000                                   (+)         80,000.00  =       880,000.00
  SRM 6 (Ammo 15) [Empty Bin]                 0                                        (+)              0.00  =       880,000.00
--------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost                                                                                      880,000.00
================================================================================================================================
BattleMech Cost
--------------------------------------------------------------------------------------------------------------------------------
  Structural Cost:                                                                              3,028,666.67                    
  Weapons and Equipment Cost:                                                          (+)        880,000.00  =     3,908,666.67
  BattleMech Cost Multiplier:                 1 + (70 / 100)                           (*)              1.70  =     6,644,733.33
--------------------------------------------------------------------------------------------------------------------------------
Final BattleMech Cost                                                                                               6,644,733.00
 |