Cost Breakdown
Name/Model: urban mech 2025
Technology: Inner Sphere
Tonnage: 30
Configuration: Biped IndustrialMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Heavy Industrial): (88 pts) 5.5 x 10,000 55,000.00
Internal Structure (Industrial): 30 x 300 x 1 (+) 9,000.00 = 64,000.00
Myomer (Standard): 30 x 2,000 (+) 60,000.00 = 124,000.00
Engine (Fusion): (5,000 x 60 x 30) / 75 (+) 120,000.00 = 244,000.00
Gyro (Standard): 1.0 x 300,000 (+) 300,000.00 = 544,000.00
Cockpit (Industrial): 100,000 (+) 100,000.00 = 644,000.00
Life Support: 50,000 (+) 50,000.00 = 694,000.00
Sensors: 30 x 2,000 (+) 60,000.00 = 754,000.00
Heat Sinks (Single): 3 x 2,000 (+) 6,000.00 = 760,000.00
Arm Actuators: 30 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 13,800.00 = 773,800.00
Leg Actuators: 30 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 21,000.00 = 794,800.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 794,800.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
ER Medium Laser 80,000 80,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 160,000.00
Jump Jets 30 x (2 x 2) x 200 (+) 24,000.00 = 184,000.00
PPC 200,000 (+) 200,000.00 = 384,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 384,000.00
=====================================================================================================================
IndustrialMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 794,800.00
Weapons and Equipment Cost: (+) 384,000.00 = 1,178,800.00
IndustrialMech Cost Multiplier: 1 + (30 / 400) (*) 1.08 = 1,267,210.00
---------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 1,267,210.00
|