Cost Breakdown
Name/Model: Firefighter mech
Technology: Inner Sphere
Tonnage: 45
Configuration: Biped IndustrialMech
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Heavy Industrial): (153 pts) 10.0 x 10,000 100,000.00
Internal Structure (Industrial): 45 x 300 x 1 (+) 13,500.00 = 113,500.00
Myomer (Standard): 45 x 2,000 (+) 90,000.00 = 203,500.00
Engine (Fuel Cell): (3,500 x 135 x 45) / 75 (+) 283,500.00 = 487,000.00
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 1,087,000.00
Cockpit (Industrial): 100,000 (+) 100,000.00 = 1,187,000.00
Life Support: 50,000 (+) 50,000.00 = 1,237,000.00
Sensors: 45 x 2,000 (+) 90,000.00 = 1,327,000.00
Heat Sinks (Single): 10 x 2,000 (+) 20,000.00 = 1,347,000.00
Arm Actuators: 45 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 20,700.00 = 1,367,700.00
Leg Actuators: 45 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 31,500.00 = 1,399,200.00
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,399,200.00
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Cargo, Liquid (2 ton) 50 x 4 200.00
Cargo, Standard (0.5 ton) 0 x 1 (+) 0.00 = 200.00
Cargo, Standard (0.5 ton) 0 x 1 (+) 0.00 = 200.00
Light Fluid Suction System 1,000 (+) 1,000.00 = 1,200.00
Light Fluid Suction System 1,000 (+) 1,000.00 = 2,200.00
Paramedic Equipment 7,500 (+) 7,500.00 = 9,700.00
Paramedic Equipment 7,500 (+) 7,500.00 = 17,200.00
Searchlight, Mounted 2,000 (+) 2,000.00 = 19,200.00
Searchlight, Mounted 2,000 (+) 2,000.00 = 21,200.00
Sprayer 1,000 (+) 1,000.00 = 22,200.00
Sprayer 1,000 (+) 1,000.00 = 23,200.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 23,200.00
=====================================================================================================================
IndustrialMech Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,399,200.00
Weapons and Equipment Cost: (+) 23,200.00 = 1,422,400.00
IndustrialMech Cost Multiplier: 1 + (45 / 400) (*) 1.11 = 1,582,420.00
---------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 1,582,420.00
|