Cost Breakdown
Name/Model: Garbage Thresher
Technology: Inner Sphere
Tonnage: 80
Configuration: Biped IndustrialMech
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Heavy Industrial): (232 pts) 14.5 x 10,000 145,000.00
Internal Structure (Industrial): 80 x 300 x 1 (+) 24,000.00 = 169,000.00
Myomer (Standard): 80 x 2,000 (+) 160,000.00 = 329,000.00
Engine (Fusion): (5,000 x 240 x 80) / 75 (+) 1,280,000.00 = 1,609,000.00
Gyro (Standard): 3.0 x 300,000 (+) 900,000.00 = 2,509,000.00
Cockpit (Industrial w/ Adv. FCS): 200,000 (+) 200,000.00 = 2,709,000.00
Life Support: 50,000 (+) 50,000.00 = 2,759,000.00
Sensors: 80 x 2,000 (+) 160,000.00 = 2,919,000.00
Arm Actuators: 80 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 36,800.00 = 2,955,800.00
Leg Actuators: 80 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 56,000.00 = 3,011,800.00
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 3,011,800.00
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
CASE II 175,000 175,000.00
CASE II 175,000 (+) 175,000.00 = 350,000.00
Lance 80 x 150 (+) 12,000.00 = 362,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 762,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 762,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 762,000.00
Rotary AC/5 275,000 (+) 275,000.00 = 1,037,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,037,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,037,000.00
Rotary AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,037,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,037,000.00
=======================================================================================================================
IndustrialMech Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost: 3,011,800.00
Weapons and Equipment Cost: (+) 1,037,000.00 = 4,048,800.00
IndustrialMech Cost Multiplier: 1 + (80 / 400) (*) 1.20 = 4,858,560.00
-----------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 4,858,560.00
|