Cost Breakdown
Name/Model: Brute MilitiaMech
Technology: Inner Sphere
Tonnage: 70
Configuration: Biped IndustrialMech
======================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------------
Armor (Heavy Industrial): (120 pts) 7.5 x 10,000 75,000.00
Internal Structure (Industrial): 70 x 300 x 1 (+) 21,000.00 = 96,000.00
Myomer (Standard): 70 x 2,000 (+) 140,000.00 = 236,000.00
Engine (Internal Combustion): (1,250 x 140 x 70) / 75 (+) 163,333.33 = 399,333.33
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 999,333.33
Cockpit (Industrial w/ Adv. FCS): 200,000 (+) 200,000.00 = 1,199,333.33
Life Support: 50,000 (+) 50,000.00 = 1,249,333.33
Sensors: 70 x 2,000 (+) 140,000.00 = 1,389,333.33
Heat Sinks (Single): 6 x 2,000 (+) 12,000.00 = 1,401,333.33
Arm Actuators: 70 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 32,200.00 = 1,433,533.33
Leg Actuators: 70 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 49,000.00 = 1,482,533.33
----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,482,533.33
======================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
CASE 50,000 (+) 50,000.00 = 100,000.00
Ejection Seat 25,000 (+) 25,000.00 = 125,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 525,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 925,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 925,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 925,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 925,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 925,000.00
----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 925,000.00
======================================================================================================================
IndustrialMech Cost
----------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,482,533.33
Weapons and Equipment Cost: (+) 925,000.00 = 2,407,533.33
IndustrialMech Cost Multiplier: 1 + (70 / 400) (*) 1.18 = 2,828,851.67
----------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 2,828,852.00
|