Cost Breakdown
Name/Model: Dig Lord RCL-Z1 Armed MiningMech
Technology: Inner Sphere
Tonnage: 65
Configuration: Biped IndustrialMech
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Heavy Industrial): (128 pts) 8.0 x 10,000 80,000.00
Internal Structure (Industrial): 65 x 300 x 1 (+) 19,500.00 = 99,500.00
Myomer (Standard): 65 x 2,000 (+) 130,000.00 = 229,500.00
Engine (Fuel Cell): (3,500 x 195 x 65) / 75 (+) 591,500.00 = 821,000.00
Gyro (Standard): 2.0 x 300,000 (+) 600,000.00 = 1,421,000.00
Cockpit (Industrial): 100,000 (+) 100,000.00 = 1,521,000.00
Life Support: 50,000 (+) 50,000.00 = 1,571,000.00
Sensors: 65 x 2,000 (+) 130,000.00 = 1,701,000.00
Heat Sinks (Single): 7 x 2,000 (+) 14,000.00 = 1,715,000.00
Arm Actuators: 65 x ((100 x 2) + (50 x 2) + (80 x 2)) (+) 29,900.00 = 1,744,900.00
Leg Actuators: 65 x ((150 x 2) + (80 x 2) + (120 x 2)) (+) 45,500.00 = 1,790,400.00
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost: 1,790,400.00
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
Actuator Enhancement System 65 x 500 32,500.00
Heavy Rifle 90,000 (+) 90,000.00 = 122,500.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 122,500.00
Heavy Rifle (Ammo 6) [Empty Bin] 0 (+) 0.00 = 122,500.00
Medium Vibroblade 400,000 (+) 400,000.00 = 522,500.00
MML 5 75,000 (+) 75,000.00 = 597,500.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 597,500.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 597,500.00
Shoulder Turret 1 x 10,000 (+) 10,000.00 = 607,500.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 607,500.00
=======================================================================================================================
IndustrialMech Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost: 1,790,400.00
Weapons and Equipment Cost: (+) 607,500.00 = 2,397,900.00
IndustrialMech Cost Multiplier: 1 + (65 / 400) (*) 1.16 = 2,787,558.75
-----------------------------------------------------------------------------------------------------------------------
Final IndustrialMech Cost 2,787,559.00
|