Cost Breakdown
Name/Model: Vedette SLDF (Royal) Cavalry Tank
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (179 pts) 10.0 x 20,000 200,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 250,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 275,000.00
Engine (XL) (20,000 x 250 x 50) / 75 (+) 3,333,333.33 = 3,608,333.33
Turret 2 x 5,000 (+) 10,000.00 = 3,618,333.33
---------------------------------------------------------------------------------------------------------
Total Structural Cost 3,618,333.33
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 350,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 350,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 350,000.00
Machine Gun 5,000 (+) 5,000.00 = 355,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 355,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 415,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 415,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 3,618,333.33
Weapons and Equipment Cost (+) 415,000.00 = 4,033,333.33
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 6,050,000.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,050,000.00
|