Cost Breakdown
Name/Model: Thumper Self Propelled Gun
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (238 pts) 12.0 x 25,000 300,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 380,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 420,000.00
Engine (Fuel Cell) (3,500 x 240 x 80) / 75 (+) 896,000.00 = 1,316,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,318,000.00
Turret 3 x 5,000 (+) 15,000.00 = 1,333,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,333,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 200,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 300,000.00
Anti-Missile System 100,000 (+) 100,000.00 = 400,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 400,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 400,000.00
Thumper 187,500 (+) 187,500.00 = 587,500.00
Thumper 187,500 (+) 187,500.00 = 775,000.00
Thumper (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 775,000.00
Thumper (Ammo 20) [Empty Bin] 0 (+) 0.00 = 775,000.00
Thumper (Ammo 20) [Fuel-Air] [Empty Bin] 0 (+) 0.00 = 775,000.00
Thumper (Ammo 20) [Smoke] [Empty Bin] 0 (+) 0.00 = 775,000.00
Thumper (Ammo 20) [Thunder] [Empty Bin] 0 (+) 0.00 = 775,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 775,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 1,333,000.00
Weapons and Equipment Cost (+) 775,000.00 = 2,108,000.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 3,794,400.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,794,400.00
|