Cost Breakdown
Name/Model: Demolisher II (Fuel Cell)
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (307 pts) 15.5 x 25,000 387,500.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 487,500.00
Control Components 5 x 10,000 (+) 50,000.00 = 537,500.00
Engine (Fuel Cell) (3,500 x 300 x 100) / 75 (+) 1,400,000.00 = 1,937,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,939,500.00
Turret 3 x 5,000 (+) 15,000.00 = 1,954,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,954,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
CASE 50,000 (+) 50,000.00 = 800,000.00
LB 20-X AC 600,000 (+) 600,000.00 = 1,400,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,400,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,400,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,400,000.00
LB 20-X AC (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,400,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,405,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,410,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,410,000.00
Supercharger 300 x 10,000 (+) 3,000,000.00 = 4,410,000.00
Ultra AC/20 480,000 (+) 480,000.00 = 4,890,000.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 4,890,000.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 4,890,000.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 4,890,000.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 4,890,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 4,890,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,954,500.00
Weapons and Equipment Cost (+) 4,890,000.00 = 6,844,500.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 13,689,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 13,689,000.00
|