Cost Breakdown
Name/Model: Axel Heavy Tank IIC (XL)
Technology: Clan
Tonnage: 65
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (220 pts) 11.5 x 20,000 230,000.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 295,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 330,000.00
Engine (XL) (20,000 x 325 x 65) / 75 (+) 5,633,333.33 = 5,963,333.33
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 5,967,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 5,974,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 5,974,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 24) [Empty Bin] 0 (+) 0.00 = 100,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 110,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 110,000.00
CASE 2 x 50,000 (+) 100,000.00 = 210,000.00
ECM Suite 200,000 (+) 200,000.00 = 410,000.00
ER Large Laser 200,000 (+) 200,000.00 = 610,000.00
LRM 15 (Ammo 8) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 610,000.00
LRM 15 (Ammo 8) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 610,000.00
LRM 15 (Ammo 8) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 610,000.00
LRM 15 (Ammo 8) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 610,000.00
LRM 15 w/ Artemis IV FCS 175,000 + 100,000 (+) 275,000.00 = 885,000.00
LRM 15 w/ Artemis IV FCS 175,000 + 100,000 (+) 275,000.00 = 1,160,000.00
Targeting Computer 1 x 10,000 (+) 10,000.00 = 1,170,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,170,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 5,974,833.33
Weapons and Equipment Cost (+) 1,170,000.00 = 7,144,833.33
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 11,788,975.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 11,788,975.00
|