Cost Breakdown
Name/Model: Condor Heavy Hover Tank (Ultra)
Technology: Inner Sphere (Mixed)
Tonnage: 50
Configuration: Hover Combat Vehicle
=====================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------
Armor (Laser Reflective) (104 pts) 6.5 x 30,000 195,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 245,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 270,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 370,000.00
Engine (Fuel Cell) (3,500 x 215 x 50) / 75 (+) 501,666.67 = 871,666.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 873,666.67
Turret 1.5 x 5,000 (+) 7,500.00 = 881,166.67
---------------------------------------------------------------------------------------------------------------------
Total Structural Cost 881,166.67
=====================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Medium Chemical Laser (C) 30,000 (+) 30,000.00 = 180,000.00
Medium Chemical Laser (C) 30,000 (+) 30,000.00 = 210,000.00
Medium Chemical Laser (Ammo 30) [Empty Bin] (C) 0 (+) 0.00 = 210,000.00
TAG 50,000 (+) 50,000.00 = 260,000.00
Ultra AC/10 (C) 320,000 (+) 320,000.00 = 580,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 580,000.00
Ultra AC/10 (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 580,000.00
---------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 580,000.00
=====================================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------------
Structural Cost 881,166.67
Weapons and Equipment Cost (+) 580,000.00 = 1,461,166.67
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 2,922,333.33
---------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,922,333.00
|