Cost Breakdown
Name/Model: Partisan Air Defense Tank (Cell)
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (143 pts) 8.0 x 20,000 160,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 240,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 280,000.00
Engine (Fuel Cell) (3,500 x 240 x 80) / 75 (+) 896,000.00 = 1,176,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,178,000.00
Turret 3.5 x 5,000 (+) 17,500.00 = 1,195,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,195,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Autocannon/2 75,000 (+) 75,000.00 = 175,000.00
Autocannon/2 75,000 (+) 75,000.00 = 250,000.00
Autocannon/2 (Ammo 45) [Empty Bin] 0 (+) 0.00 = 250,000.00
C3 Slave 250,000 (+) 250,000.00 = 500,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 900,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,300,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,300,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,300,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,300,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,305,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,310,000.00
Machine Gun (Ammo 200) [Empty Bin] 0 (+) 0.00 = 1,310,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,310,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,195,500.00
Weapons and Equipment Cost (+) 1,310,000.00 = 2,505,500.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 4,509,900.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,509,900.00
|