Cost Breakdown
Name/Model: Partisan Heavy Tank (Refit)
Technology: Inner Sphere
Tonnage: 80
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (96 pts) 6.0 x 10,000 60,000.00
Internal Structure (Standard) 8.0 x 10,000 (+) 80,000.00 = 140,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 180,000.00
Engine (Internal Combustion) (1,250 x 240 x 80) / 75 (+) 320,000.00 = 500,000.00
Turret 3.5 x 5,000 (+) 17,500.00 = 517,500.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 517,500.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
LB 10-X AC 400,000 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
Machine Gun 5,000 (+) 5,000.00 = 805,000.00
Machine Gun 5,000 (+) 5,000.00 = 810,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 810,000.00
Ultra AC/5 200,000 (+) 200,000.00 = 1,010,000.00
Ultra AC/5 (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,010,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,010,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 517,500.00
Weapons and Equipment Cost (+) 1,010,000.00 = 1,527,500.00
Combat Vehicle Cost Multiplier 1 + (80 / 100) (*) 1.8 = 2,749,500.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,749,500.00
|