Cost Breakdown
Name/Model: Untitled
Technology: Inner Sphere (Mixed)
Tonnage: 100
Configuration: Tracked Combat Vehicle
===========================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (390 pts) 20.5 x 20,000 410,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 510,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 560,000.00
Engine (Fusion) (5,000 x 200 x 100) / 75 (+) 1,333,333.33 = 1,893,333.33
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 1,903,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 1,910,833.33
-----------------------------------------------------------------------------------------------------------
Total Structural Cost 1,910,833.33
===========================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------
Active Probe (C) 200,000 200,000.00
Bulldozer (C) 50,000 (+) 50,000.00 = 250,000.00
CASE 50,000 (+) 50,000.00 = 300,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 600,000.00
Improved C3 Computer 750,000 (+) 750,000.00 = 1,350,000.00
LB 20-X AC (C) 600,000 (+) 600,000.00 = 1,950,000.00
LB 20-X AC (Ammo 5) [Empty Bin] (C) 0 (+) 0.00 = 1,950,000.00
LB 20-X AC (Ammo 5) [Empty Bin] (C) 0 (+) 0.00 = 1,950,000.00
LB 20-X AC (Ammo 5) [Empty Bin] (C) 0 (+) 0.00 = 1,950,000.00
LB 20-X AC (Ammo 5) [Empty Bin] (C) 0 (+) 0.00 = 1,950,000.00
TAG (C) 50,000 (+) 50,000.00 = 2,000,000.00
Ultra AC/5 (C) 200,000 (+) 200,000.00 = 2,200,000.00
Ultra AC/5 (C) 200,000 (+) 200,000.00 = 2,400,000.00
Ultra AC/5 (Ammo 20) [Empty Bin] (C) 0 (+) 0.00 = 2,400,000.00
Ultra AC/5 (Ammo 20) [Empty Bin] (C) 0 (+) 0.00 = 2,400,000.00
-----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,400,000.00
===========================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------
Structural Cost 1,910,833.33
Weapons and Equipment Cost (+) 2,400,000.00 = 4,310,833.33
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 8,621,666.67
-----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,621,667.00
|