Cost Breakdown
Name/Model: Heimdall Ground Monitor Tank C
Technology: Clan
Tonnage: 95
Configuration: Tracked OmniVehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Standard) (352 pts) 22.0 x 10,000 220,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 315,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 365,000.00
Engine (XL) (20,000 x 285 x 95) / 75 (+) 7,220,000.00 = 7,585,000.00
Heat Sinks (Single) 2 x 2,000 (+) 4,000.00 = 7,589,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 7,596,500.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,596,500.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
CASE 2 x 50,000 100,000.00
Hyper-Assault Gauss 20 400,000 (+) 400,000.00 = 500,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 500,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 500,000.00
Hyper-Assault Gauss 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 500,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 900,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,300,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,300,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,300,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,300,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,360,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,420,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,480,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,480,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 7,596,500.00
Weapons and Equipment Cost (+) 1,480,000.00 = 9,076,500.00
Omni Conversion Cost 9,076,500.00 x 0.25 (+) 2,269,125.00 = 11,345,625.00
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 22,123,968.75
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 22,123,969.00
|