Cost Breakdown
Name/Model: Manticore Assault
Technology: Inner Sphere (Mixed)
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Lamellor) (196 pts) 14.0 x 35,000 490,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 550,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 580,000.00
Engine (XL) (20,000 x 240 x 60) / 75 (+) 3,840,000.00 = 4,420,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 4,427,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,427,500.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
ATM 6 (C) 125,000 (+) 125,000.00 = 875,000.00
ATM 6 (C) 125,000 (+) 125,000.00 = 1,000,000.00
ATM 6 (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 1,000,000.00
ATM 6 (Ammo 10) [Empty Bin] (C) 0 (+) 0.00 = 1,000,000.00
ATM 6 (Ammo 10) [ER] [Empty Bin] (C) 0 (+) 0.00 = 1,000,000.00
ATM 6 (Ammo 10) [ER] [Empty Bin] (C) 0 (+) 0.00 = 1,000,000.00
ATM 6 (Ammo 10) [HE] [Empty Bin] (C) 0 (+) 0.00 = 1,000,000.00
ATM 6 (Ammo 10) [HE] [Empty Bin] (C) 0 (+) 0.00 = 1,000,000.00
CASE (C) 1 x 50,000 (+) 50,000.00 = 1,050,000.00
Flamer (Vehicle) 7,500 (+) 7,500.00 = 1,057,500.00
Flamer (Vehicle) (Ammo 20) [Empty Bin] 0 (+) 0.00 = 1,057,500.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 1,257,500.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,257,500.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 1,557,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,557,500.00
===============================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost 4,427,500.00
Weapons and Equipment Cost (+) 1,557,500.00 = 5,985,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 9,576,000.00
-------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 9,576,000.00
|