Cost Breakdown
Name/Model: Shoden Assault Vehicle (LB-X)
Technology: Clan
Tonnage: 70
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (184 pts) 11.5 x 10,000 115,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 185,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 220,000.00
Engine (Fusion) (5,000 x 260 x 70) / 75 (+) 1,213,333.33 = 1,433,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 1,440,833.33
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,440,833.33
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
AP Gauss Rifle 10,000 10,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 30,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 40,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 50,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 60,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 70,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 80,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 90,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 100,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 100,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 5 x 50,000 (+) 250,000.00 = 350,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 430,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 510,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 910,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 910,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 910,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 910,000.00
SRM 4 60,000 (+) 60,000.00 = 970,000.00
SRM 4 60,000 (+) 60,000.00 = 1,030,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 1,030,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,030,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,440,833.33
Weapons and Equipment Cost (+) 1,030,000.00 = 2,470,833.33
Combat Vehicle Cost Multiplier 1 + (70 / 200) (*) 1.35 = 3,335,625.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,335,625.00
|