Cost Breakdown
Name/Model: Enyo Strike Tank (LB-X) "Sholef"
Technology: Clan
Tonnage: 55
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (144 pts) 7.5 x 20,000 150,000.00
Internal Structure (Standard) 5.5 x 10,000 (+) 55,000.00 = 205,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 235,000.00
Engine (XL) (20,000 x 275 x 55) / 75 (+) 4,033,333.33 = 4,268,333.33
Turret 1.5 x 5,000 (+) 7,500.00 = 4,275,833.33
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,275,833.33
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
AP Gauss Rifle 10,000 10,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 20,000.00
CASE 2 x 50,000 (+) 100,000.00 = 120,000.00
ECM Suite 200,000 (+) 200,000.00 = 320,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 720,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 720,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 720,000.00
Plasma Cannon 320,000 (+) 320,000.00 = 1,040,000.00
Plasma Cannon (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,040,000.00
SRM 6 80,000 (+) 80,000.00 = 1,120,000.00
SRM 6 80,000 (+) 80,000.00 = 1,200,000.00
SRM 6 80,000 (+) 80,000.00 = 1,280,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,280,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,280,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,280,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 4,275,833.33
Weapons and Equipment Cost (+) 1,280,000.00 = 5,555,833.33
Combat Vehicle Cost Multiplier 1 + (55 / 100) (*) 1.55 = 8,611,541.67
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,611,542.00
|