Cost Breakdown
Name/Model: Ratte-X
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (390 pts) 22.0 x 20,000 440,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 540,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 590,000.00
Engine (XXL) (100,000 x 300 x 100) / 75 (+) 40,000,000.00 = 40,590,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 40,602,500.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 40,602,500.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
Anti-Battle Armor Pod 2,500 2,500.00
Anti-Missile System 100,000 (+) 100,000.00 = 102,500.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 102,500.00
Anti-Personnel Pod 1,500 (+) 1,500.00 = 104,000.00
CASE 50,000 (+) 50,000.00 = 154,000.00
Compartment, Infantry (1 ton) 2 x 0 (+) 0.00 = 154,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 304,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 454,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 604,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 604,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 604,000.00
LRM 15 (Ammo 8) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 604,000.00
LRM 15 w/ Artemis IV FCS 175,000 + 100,000 (+) 275,000.00 = 879,000.00
Ultra AC/20 480,000 (+) 480,000.00 = 1,359,000.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,359,000.00
Ultra AC/20 (Ammo 5) [Empty Bin] 0 (+) 0.00 = 1,359,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,359,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 40,602,500.00
Weapons and Equipment Cost (+) 1,359,000.00 = 41,961,500.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 83,923,000.00
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 83,923,000.00
|