Cost Breakdown
Name/Model: C - Pike
Technology: Inner Sphere (Mixed)
Tonnage: 60
Configuration: Tracked Combat Vehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (248 pts) 12.5 x 25,000 312,500.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 372,500.00
Control Components 3 x 10,000 (+) 30,000.00 = 402,500.00
Engine (XL) (20,000 x 240 x 60) / 75 (+) 3,840,000.00 = 4,242,500.00
Turret 2 x 5,000 (+) 10,000.00 = 4,252,500.00
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 4,252,500.00
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ECM Suite (C) 200,000 (+) 200,000.00 = 250,000.00
LB 5-X AC (C) 250,000 (+) 250,000.00 = 500,000.00
LB 5-X AC (C) 250,000 (+) 250,000.00 = 750,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 750,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 750,000.00
LB 5-X AC (Ammo 20) [Empty Bin] (C) 0 (+) 0.00 = 750,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 1,010,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,010,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,010,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,010,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,010,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 4,252,500.00
Weapons and Equipment Cost (+) 1,010,000.00 = 5,262,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 8,420,000.00
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,420,000.00
|