Cost Breakdown
Name/Model: C - Vali
Technology: Inner Sphere (Mixed)
Tonnage: 40
Configuration: Wheeled Combat Vehicle
===========================================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (148 pts) 7.5 x 25,000 187,500.00
Internal Structure (Standard) 4.0 x 10,000 (+) 40,000.00 = 227,500.00
Control Components 2 x 10,000 (+) 20,000.00 = 247,500.00
Engine (Fuel Cell) (3,500 x 180 x 40) / 75 (+) 336,000.00 = 583,500.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 585,500.00
---------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 585,500.00
===========================================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------------------
Arrow IV System (C) 450,000 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] (C) 0 (+) 0.00 = 450,000.00
---------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 450,000.00
===========================================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------------------
Structural Cost 585,500.00
Weapons and Equipment Cost (+) 450,000.00 = 1,035,500.00
Combat Vehicle Cost Multiplier 1 + (40 / 200) (*) 1.2 = 1,242,600.00
---------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,242,600.00
|