Cost Breakdown
Name/Model: Thorakitai
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (355 pts) 18.0 x 25,000 450,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 540,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 585,000.00
Engine (Fusion) (5,000 x 270 x 90) / 75 (+) 1,620,000.00 = 2,205,000.00
Turret 3 x 5,000 (+) 15,000.00 = 2,220,000.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 2,220,000.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 350,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 350,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 350,000.00
MML 5 75,000 (+) 75,000.00 = 425,000.00
MML 5 75,000 (+) 75,000.00 = 500,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 500,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 500,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 500,000.00
PPC 200,000 (+) 200,000.00 = 700,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 700,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 2,220,000.00
Weapons and Equipment Cost (+) 700,000.00 = 2,920,000.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 5,548,000.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,548,000.00
|