Cost Breakdown
Name/Model: Velite
Technology: Inner Sphere
Tonnage: 70
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (285 pts) 14.5 x 25,000 362,500.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 432,500.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 467,500.00
Engine (Fuel Cell) (3,500 x 280 x 70) / 75 (+) 914,666.67 = 1,382,166.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 1,384,166.67
Turret 2 x 5,000 (+) 10,000.00 = 1,394,166.67
-------------------------------------------------------------------------------------------------------
Total Structural Cost 1,394,166.67
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
Gauss Rifle 300,000 300,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 300,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 300,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 500,000.00
MML 5 75,000 (+) 75,000.00 = 575,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 575,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 575,000.00
Trailer Hitch 0 (+) 0.00 = 575,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 575,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 1,394,166.67
Weapons and Equipment Cost (+) 575,000.00 = 1,969,166.67
Combat Vehicle Cost Multiplier 1 + (70 / 100) (*) 1.7 = 3,347,583.33
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,347,583.00
|