Cost Breakdown
Name/Model: Heimdall (Ghost)
Technology: Clan (Mixed)
Tonnage: 95
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Standard) (352 pts) 22.0 x 10,000 220,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 315,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 365,000.00
Engine (XL) (20,000 x 285 x 95) / 75 (+) 7,220,000.00 = 7,585,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 7,592,500.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 7,592,500.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
C3 Computer (Master) (IS) 1,500,000 1,500,000.00
CASE 2 x 50,000 (+) 100,000.00 = 1,600,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 1,680,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 1,760,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 2,060,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 2,060,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 2,060,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 2,460,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 2,860,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,860,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 2,860,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 2,860,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,860,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 7,592,500.00
Weapons and Equipment Cost (+) 2,860,000.00 = 10,452,500.00
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 20,382,375.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 20,382,375.00
|