Cost Breakdown
Name/Model: Bulldozer BD-02Z
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (277 pts) 15.5 x 20,000 310,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 400,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 445,000.00
Engine (Fusion) (5,000 x 270 x 90) / 75 (+) 1,620,000.00 = 2,065,000.00
Turret 3 x 5,000 (+) 15,000.00 = 2,080,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,080,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 550,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 550,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 550,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 550,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 550,000.00
LRM 15 (Ammo 8) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 550,000.00
LRM 15 (Ammo 8) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 550,000.00
LRM 15 w/ Artemis IV FCS 175,000 + 100,000 (+) 275,000.00 = 825,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 885,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 901,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 917,000.00
SRM 6 (Ammo 15) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 917,000.00
SRM 6 w/ Artemis IV FCS 80,000 + 100,000 (+) 180,000.00 = 1,097,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,097,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 2,080,000.00
Weapons and Equipment Cost (+) 1,097,000.00 = 3,177,000.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 6,036,300.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,036,300.00
|