Cost Breakdown
Name/Model: Sasquatch Heavy Tank
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Standard) (224 pts) 14.0 x 10,000 140,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 230,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 275,000.00
Engine (Fusion) (5,000 x 270 x 90) / 75 (+) 1,620,000.00 = 1,895,000.00
Turret 3 x 5,000 (+) 15,000.00 = 1,910,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,910,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
CASE 50,000 (+) 50,000.00 = 150,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 450,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 450,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 450,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 850,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 850,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 850,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 910,000.00
Searchlight, Mounted 2,000 (+) 2,000.00 = 912,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 928,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 944,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 960,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 960,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,910,000.00
Weapons and Equipment Cost (+) 960,000.00 = 2,870,000.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 5,453,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,453,000.00
|