Cost Breakdown
Name/Model: Brutus Assault Tank HPPC
Technology: Inner Sphere
Tonnage: 75
Configuration: Tracked Combat Vehicle
=======================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------
Armor (Standard) (136 pts) 8.5 x 10,000 85,000.00
Internal Structure (Standard) 7.5 x 10,000 (+) 75,000.00 = 160,000.00
Control Components 4 x 10,000 (+) 40,000.00 = 200,000.00
Engine (Fusion) (5,000 x 225 x 75) / 75 (+) 1,125,000.00 = 1,325,000.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 1,335,000.00
Turret 2 x 5,000 (+) 10,000.00 = 1,345,000.00
-------------------------------------------------------------------------------------------------------
Total Structural Cost 1,345,000.00
=======================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
Heavy PPC 250,000 (+) 250,000.00 = 500,000.00
LRM 20 250,000 (+) 250,000.00 = 750,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 750,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 750,000.00
LRM 20 (Ammo 6) [Empty Bin] 0 (+) 0.00 = 750,000.00
SRM 2 10,000 (+) 10,000.00 = 760,000.00
SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 760,000.00
SRM 6 80,000 (+) 80,000.00 = 840,000.00
SRM 6 80,000 (+) 80,000.00 = 920,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 920,000.00
-------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 920,000.00
=======================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------
Structural Cost 1,345,000.00
Weapons and Equipment Cost (+) 920,000.00 = 2,265,000.00
Combat Vehicle Cost Multiplier 1 + (75 / 100) (*) 1.75 = 3,963,750.00
-------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,963,750.00
|