Cost Breakdown
Name/Model: Epona Pursuit Tank E
Technology: Clan
Tonnage: 50
Configuration: Hover OmniVehicle
==========================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (96 pts) 5.0 x 20,000 100,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 150,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 175,000.00
Lift/Dive Equipment 5 x 20,000 (+) 100,000.00 = 275,000.00
Engine (Fusion) (5,000 x 215 x 50) / 75 (+) 716,666.67 = 991,666.67
Heat Sinks (Single) 4 x 2,000 (+) 8,000.00 = 999,666.67
Turret 1 x 5,000 (+) 5,000.00 = 1,004,666.67
----------------------------------------------------------------------------------------------------------
Total Structural Cost 1,004,666.67
==========================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------
AP Gauss Rifle 10,000 10,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 30,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 40,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 50,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 60,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 60,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 60,000.00
CASE 1 x 50,000 (+) 50,000.00 = 110,000.00
Plasma Cannon 320,000 (+) 320,000.00 = 430,000.00
Plasma Cannon 320,000 (+) 320,000.00 = 750,000.00
Plasma Cannon (Ammo 10) [Empty Bin] 0 (+) 0.00 = 750,000.00
Plasma Cannon (Ammo 10) [Empty Bin] 0 (+) 0.00 = 750,000.00
----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 750,000.00
==========================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------
Structural Cost 1,004,666.67
Weapons and Equipment Cost (+) 750,000.00 = 1,754,666.67
Omni Conversion Cost 1,754,666.67 x 0.25 (+) 438,666.67 = 2,193,333.33
Combat Vehicle Cost Multiplier 1 + (50 / 50) (*) 2 = 4,386,666.67
----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,386,667.00
|