Cost Breakdown
Name/Model: Svantovit Infantry Fighting Vehicle (ATM) "Masada"
Technology: Clan
Tonnage: 35
Configuration: Hover Combat Vehicle
===========================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (57 pts) 3.0 x 20,000 60,000.00
Internal Structure (Standard) 3.5 x 10,000 (+) 35,000.00 = 95,000.00
Control Components 2 x 10,000 (+) 20,000.00 = 115,000.00
Lift/Dive Equipment 3.5 x 20,000 (+) 70,000.00 = 185,000.00
Engine (XL) (20,000 x 210 x 35) / 75 (+) 1,960,000.00 = 2,145,000.00
Turret 1 x 5,000 (+) 5,000.00 = 2,150,000.00
-----------------------------------------------------------------------------------------------------------
Total Structural Cost 2,150,000.00
===========================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------
AP Gauss Rifle 10,000 10,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 20,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 20,000.00
ATM 9 225,000 (+) 225,000.00 = 245,000.00
ATM 9 (Ammo 7) [Empty Bin] 0 (+) 0.00 = 245,000.00
ATM 9 (Ammo 7) [ER] [Empty Bin] 0 (+) 0.00 = 245,000.00
ATM 9 (Ammo 7) [HE] [Empty Bin] 0 (+) 0.00 = 245,000.00
CASE 2 x 50,000 (+) 100,000.00 = 345,000.00
Compartment, Infantry (5 ton) 10 x 0 (+) 0.00 = 345,000.00
-----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 345,000.00
===========================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------
Structural Cost 2,150,000.00
Weapons and Equipment Cost (+) 345,000.00 = 2,495,000.00
Combat Vehicle Cost Multiplier 1 + (35 / 50) (*) 1.7 = 4,241,500.00
-----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 4,241,500.00
|