Cost Breakdown
Name/Model: Manticore Heavy Tank (Plasma)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
==========================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------
Armor (Hardened) (104 pts) 13.0 x 15,000 195,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 255,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 285,000.00
Engine (XL) (20,000 x 240 x 60) / 75 (+) 3,840,000.00 = 4,125,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 4,132,500.00
----------------------------------------------------------------------------------------------------------
Total Structural Cost 4,132,500.00
==========================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
CASE 50,000 (+) 50,000.00 = 800,000.00
MML 5 75,000 (+) 75,000.00 = 875,000.00
MML 5 75,000 (+) 75,000.00 = 950,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 950,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 950,000.00
MML 5 (Ammo 20) [SRM] [Empty Bin] 0 (+) 0.00 = 950,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 950,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 950,000.00
MML 5 (Ammo 24) [LRM] [Empty Bin] 0 (+) 0.00 = 950,000.00
Plasma Rifle 260,000 (+) 260,000.00 = 1,210,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,210,000.00
Plasma Rifle (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,210,000.00
Thunderbolt 5 50,000 (+) 50,000.00 = 1,260,000.00
Thunderbolt 5 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,260,000.00
Thunderbolt 5 (Ammo 12) [Empty Bin] 0 (+) 0.00 = 1,260,000.00
----------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,260,000.00
==========================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------
Structural Cost 4,132,500.00
Weapons and Equipment Cost (+) 1,260,000.00 = 5,392,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 8,628,000.00
----------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 8,628,000.00
|