Cost Breakdown
Name/Model: Po II Heavy Tank (Stealth)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Vehicular Stealth) (176 pts) 11.0 x 50,000 550,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 610,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 640,000.00
Engine (XL) (20,000 x 240 x 60) / 75 (+) 3,840,000.00 = 4,480,000.00
Turret 2.5 x 5,000 (+) 12,500.00 = 4,492,500.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost 4,492,500.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 1,050,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 1,050,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,055,000.00
Machine Gun 5,000 (+) 5,000.00 = 1,060,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 1,060,000.00
SRM 6 80,000 (+) 80,000.00 = 1,140,000.00
SRM 6 80,000 (+) 80,000.00 = 1,220,000.00
SRM 6 (Ammo 15) [Empty Bin] 0 (+) 0.00 = 1,220,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,220,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 4,492,500.00
Weapons and Equipment Cost (+) 1,220,000.00 = 5,712,500.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 9,140,000.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 9,140,000.00
|