Cost Breakdown
Name/Model: Odin Scout Tank (Spotter)
Technology: Clan
Tonnage: 20
Configuration: Wheeled Combat Vehicle
=======================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (28 pts) 1.5 x 20,000 30,000.00
Internal Structure (Standard) 2.0 x 10,000 (+) 20,000.00 = 50,000.00
Control Components 1 x 10,000 (+) 10,000.00 = 60,000.00
Engine (Fuel Cell) (3,500 x 140 x 20) / 75 (+) 130,666.67 = 190,666.67
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 192,666.67
Turret 0.5 x 5,000 (+) 2,500.00 = 195,166.67
-----------------------------------------------------------------------------------------------------------------------
Total Structural Cost 195,166.67
=======================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------------
Active Probe 200,000 200,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 210,000.00
AP Gauss Rifle 10,000 (+) 10,000.00 = 220,000.00
AP Gauss Rifle (Ammo 40) [Empty Bin] 0 (+) 0.00 = 220,000.00
CASE 2 x 50,000 (+) 100,000.00 = 320,000.00
ECM Suite 200,000 (+) 200,000.00 = 520,000.00
Narc Missile Beacon 100,000 (+) 100,000.00 = 620,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 620,000.00
Narc Missile Beacon (Ammo 6) [Homing] [Empty Bin] 0 (+) 0.00 = 620,000.00
TAG 50,000 (+) 50,000.00 = 670,000.00
-----------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 670,000.00
=======================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------------
Structural Cost 195,166.67
Weapons and Equipment Cost (+) 670,000.00 = 865,166.67
Combat Vehicle Cost Multiplier 1 + (20 / 200) (*) 1.1 = 951,683.33
-----------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 951,683.00
|