Cost Breakdown
Name/Model: Buffalo Heavy Tank BFT-3
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (352 pts) 18.0 x 25,000 450,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 540,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 585,000.00
Engine (XXL) (100,000 x 360 x 90) / 75 (+) 43,200,000.00 = 43,785,000.00
Turret 3.5 x 5,000 (+) 17,500.00 = 43,802,500.00
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 43,802,500.00
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER Small Laser 11,250 (+) 11,250.00 = 261,250.00
LB 10-X AC 400,000 (+) 400,000.00 = 661,250.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,061,250.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,461,250.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,461,250.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,461,250.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,461,250.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,461,250.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,461,250.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 43,802,500.00
Weapons and Equipment Cost (+) 1,461,250.00 = 45,263,750.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 86,001,125.00
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 86,001,125.00
|