Cost Breakdown
Name/Model: Longhorn MMLS
Technology: Inner Sphere
Tonnage: 50
Configuration: Tracked Combat Vehicle
=========================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------
Armor (Standard) (64 pts) 4.0 x 10,000 40,000.00
Internal Structure (Standard) 5.0 x 10,000 (+) 50,000.00 = 90,000.00
Control Components 2.5 x 10,000 (+) 25,000.00 = 115,000.00
Engine (Fuel Cell) (3,500 x 150 x 50) / 75 (+) 350,000.00 = 465,000.00
Heat Sinks (Single) 1 x 2,000 (+) 2,000.00 = 467,000.00
Turret 1.5 x 5,000 (+) 7,500.00 = 474,500.00
-------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 474,500.00
=========================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------
Arrow IV System 450,000 450,000.00
Arrow IV System (Ammo 5) [Illumination] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Non-Homing] [Empty Bin] 0 (+) 0.00 = 450,000.00
Arrow IV System (Ammo 5) [Smoke] [Empty Bin] 0 (+) 0.00 = 450,000.00
Communications Equipment (8 ton) 8 x 10000 (+) 80,000.00 = 530,000.00
Machine Gun 5,000 (+) 5,000.00 = 535,000.00
Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 535,000.00
-------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 535,000.00
=========================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------
Structural Cost 474,500.00
Weapons and Equipment Cost (+) 535,000.00 = 1,009,500.00
Combat Vehicle Cost Multiplier 1 + (50 / 100) (*) 1.5 = 1,514,250.00
-------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,514,250.00
|