Cost Breakdown
Name/Model: Black Scorpion
Technology: Inner Sphere
Tonnage: 25
Configuration: Tracked Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Vehicular Stealth) (48 pts) 3.0 x 50,000 150,000.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 175,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 190,000.00
Engine (Light Fusion) (15,000 x 100 x 25) / 75 (+) 500,000.00 = 690,000.00
Turret 1 x 5,000 (+) 5,000.00 = 695,000.00
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 695,000.00
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 250,000.00
LB 5-X AC 250,000 (+) 250,000.00 = 500,000.00
LB 5-X AC (Ammo 20) [Cluster] [Empty Bin] 0 (+) 0.00 = 500,000.00
LB 5-X AC (Ammo 20) [Empty Bin] 0 (+) 0.00 = 500,000.00
Light Machine Gun 5,000 (+) 5,000.00 = 505,000.00
Light Machine Gun (Ammo 100) [Empty Bin] 0 (+) 0.00 = 505,000.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 505,000.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 695,000.00
Weapons and Equipment Cost (+) 505,000.00 = 1,200,000.00
Combat Vehicle Cost Multiplier 1 + (25 / 100) (*) 1.25 = 1,500,000.00
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,500,000.00
|