Cost Breakdown
Name/Model: Ontos Heavy Tank (Light Gauss)
Technology: Inner Sphere
Tonnage: 95
Configuration: Tracked Combat Vehicle
=============================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (170 pts) 9.5 x 20,000 190,000.00
Internal Structure (Standard) 9.5 x 10,000 (+) 95,000.00 = 285,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 335,000.00
Engine (Fusion) (5,000 x 285 x 95) / 75 (+) 1,805,000.00 = 2,140,000.00
Turret 4 x 5,000 (+) 20,000.00 = 2,160,000.00
-------------------------------------------------------------------------------------------------------------
Total Structural Cost 2,160,000.00
=============================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------
ER Medium Laser 80,000 80,000.00
ER Medium Laser 80,000 (+) 80,000.00 = 160,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 435,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 710,000.00
Light Gauss Rifle 275,000 (+) 275,000.00 = 985,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 985,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 985,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 985,000.00
Light Gauss Rifle (Ammo 16) [Empty Bin] 0 (+) 0.00 = 985,000.00
-------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 985,000.00
=============================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------
Structural Cost 2,160,000.00
Weapons and Equipment Cost (+) 985,000.00 = 3,145,000.00
Combat Vehicle Cost Multiplier 1 + (95 / 100) (*) 1.95 = 6,132,750.00
-------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 6,132,750.00
|