Cost Breakdown
Name/Model: Challenger MBT X
Technology: Inner Sphere
Tonnage: 90
Configuration: Tracked Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (250 pts) 14.0 x 20,000 280,000.00
Internal Structure (Standard) 9.0 x 10,000 (+) 90,000.00 = 370,000.00
Control Components 4.5 x 10,000 (+) 45,000.00 = 415,000.00
Engine (XL) (20,000 x 270 x 90) / 75 (+) 6,480,000.00 = 6,895,000.00
Turret 3.5 x 5,000 (+) 17,500.00 = 6,912,500.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,912,500.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
Anti-Missile System 100,000 100,000.00
Anti-Missile System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 100,000.00
Gauss Rifle 300,000 (+) 300,000.00 = 400,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 400,000.00
Gauss Rifle (Ammo 8) [Empty Bin] 0 (+) 0.00 = 400,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 800,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 800,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 800,000.00
LRM 10 (Ammo 12) [Artemis IV] [Empty Bin] 0 (+) 0.00 = 800,000.00
LRM 10 w/ Artemis IV FCS 100,000 + 100,000 (+) 200,000.00 = 1,000,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,060,000.00
Medium Pulse Laser 60,000 (+) 60,000.00 = 1,120,000.00
Small Pulse Laser 16,000 (+) 16,000.00 = 1,136,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 1,151,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 1,166,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 1,166,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,166,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 6,912,500.00
Weapons and Equipment Cost (+) 1,166,000.00 = 8,078,500.00
Combat Vehicle Cost Multiplier 1 + (90 / 100) (*) 1.9 = 15,349,150.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 15,349,150.00
|