Cost Breakdown
Name/Model: Creeping Death Unknown
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
==================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------
Armor (Vehicular Stealth) (384 pts) 24.0 x 50,000 1,200,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 1,300,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 1,350,000.00
Engine (XL) (20,000 x 200 x 100) / 75 (+) 5,333,333.33 = 6,683,333.33
------------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,683,333.33
==================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
Guardian ECM Suite 200,000 (+) 200,000.00 = 250,000.00
Heavy Gauss Rifle 500,000 (+) 500,000.00 = 750,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 750,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 750,000.00
Heavy Gauss Rifle (Ammo 4) [Empty Bin] 0 (+) 0.00 = 750,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,150,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,550,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,550,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,550,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,550,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,550,000.00
SRM 4 60,000 (+) 60,000.00 = 1,610,000.00
SRM 4 60,000 (+) 60,000.00 = 1,670,000.00
SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 1,670,000.00
------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,670,000.00
==================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------
Structural Cost 6,683,333.33
Weapons and Equipment Cost (+) 1,670,000.00 = 8,353,333.33
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 16,706,666.67
------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 16,706,667.00
|