Cost Breakdown
Name/Model: Typhoon Urban Assault Vehicle (LB-X)
Technology: Inner Sphere
Tonnage: 70
Configuration: Wheeled Combat Vehicle
================================================================================================================
Structural Cost
----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (197 pts) 11.0 x 20,000 220,000.00
Internal Structure (Standard) 7.0 x 10,000 (+) 70,000.00 = 290,000.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 325,000.00
Engine (Fusion) (5,000 x 190 x 70) / 75 (+) 886,666.67 = 1,211,666.67
Turret 2.5 x 5,000 (+) 12,500.00 = 1,224,166.67
----------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,224,166.67
================================================================================================================
Weapons and Equipment Cost
----------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
ER Small Laser 11,250 (+) 11,250.00 = 261,250.00
LB 10-X AC 400,000 (+) 400,000.00 = 661,250.00
LB 10-X AC 400,000 (+) 400,000.00 = 1,061,250.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,061,250.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,061,250.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,061,250.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 1,061,250.00
Streak SRM 4 90,000 (+) 90,000.00 = 1,151,250.00
Streak SRM 4 90,000 (+) 90,000.00 = 1,241,250.00
Streak SRM 4 (Ammo 25) [Empty Bin] 0 (+) 0.00 = 1,241,250.00
----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,241,250.00
================================================================================================================
Combat Vehicle Cost
----------------------------------------------------------------------------------------------------------------
Structural Cost 1,224,166.67
Weapons and Equipment Cost (+) 1,241,250.00 = 2,465,416.67
Combat Vehicle Cost Multiplier 1 + (70 / 200) (*) 1.35 = 3,328,312.50
----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,328,313.00
|