Cost Breakdown
Name/Model: Thor Assault Vehicle
Technology: Inner Sphere
Tonnage: 55
Configuration: Wheeled Combat Vehicle
=================================================================================================================
Structural Cost
-----------------------------------------------------------------------------------------------------------------
Armor (Ferro-Fibrous) (125 pts) 7.0 x 20,000 140,000.00
Internal Structure (Standard) 5.5 x 10,000 (+) 55,000.00 = 195,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 225,000.00
Engine (XL) (20,000 x 255 x 55) / 75 (+) 3,740,000.00 = 3,965,000.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 3,975,000.00
Turret 1 x 5,000 (+) 5,000.00 = 3,980,000.00
-----------------------------------------------------------------------------------------------------------------
Total Structural Cost 3,980,000.00
=================================================================================================================
Weapons and Equipment Cost
-----------------------------------------------------------------------------------------------------------------
CASE 50,000 50,000.00
ER Large Laser 200,000 (+) 200,000.00 = 250,000.00
LB 10-X AC 400,000 (+) 400,000.00 = 650,000.00
LB 10-X AC (Ammo 10) [Cluster] [Empty Bin] 0 (+) 0.00 = 650,000.00
LB 10-X AC (Ammo 10) [Empty Bin] 0 (+) 0.00 = 650,000.00
Medium Laser 40,000 (+) 40,000.00 = 690,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 705,000.00
Streak SRM 2 15,000 (+) 15,000.00 = 720,000.00
Streak SRM 2 (Ammo 50) [Empty Bin] 0 (+) 0.00 = 720,000.00
-----------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 720,000.00
=================================================================================================================
Combat Vehicle Cost
-----------------------------------------------------------------------------------------------------------------
Structural Cost 3,980,000.00
Weapons and Equipment Cost (+) 720,000.00 = 4,700,000.00
Combat Vehicle Cost Multiplier 1 + (55 / 200) (*) 1.275 = 5,992,500.00
-----------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 5,992,500.00
|