Cost Breakdown
Name/Model: AC/2 Carrier (LB-X)
Technology: Inner Sphere
Tonnage: 60
Configuration: Tracked Combat Vehicle
===============================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------------
Armor (Standard) (88 pts) 5.5 x 10,000 55,000.00
Internal Structure (Standard) 6.0 x 10,000 (+) 60,000.00 = 115,000.00
Control Components 3 x 10,000 (+) 30,000.00 = 145,000.00
Engine (Fusion) (5,000 x 180 x 60) / 75 (+) 720,000.00 = 865,000.00
---------------------------------------------------------------------------------------------------------------
Total Structural Cost 865,000.00
===============================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------------
C3 Slave 250,000 250,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 400,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 550,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 700,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 850,000.00
LB 2-X AC 150,000 (+) 150,000.00 = 1,000,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LB 2-X AC (Ammo 45) [Cluster] [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
LB 2-X AC (Ammo 45) [Empty Bin] 0 (+) 0.00 = 1,000,000.00
---------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 1,000,000.00
===============================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------------
Structural Cost 865,000.00
Weapons and Equipment Cost (+) 1,000,000.00 = 1,865,000.00
Combat Vehicle Cost Multiplier 1 + (60 / 100) (*) 1.6 = 2,984,000.00
---------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,984,000.00
|