Cost Breakdown
Name/Model: Behemoth C
Technology: Inner Sphere (Mixed)
Tonnage: 100
Configuration: Tracked Combat Vehicle
============================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (386 pts) 19.5 x 25,000 487,500.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 587,500.00
Control Components 5 x 10,000 (+) 50,000.00 = 637,500.00
Engine (XL) (20,000 x 300 x 100) / 75 (+) 8,000,000.00 = 8,637,500.00
Heat Sinks (Single) 5 x 2,000 (+) 10,000.00 = 8,647,500.00
Turret 3 x 5,000 (+) 15,000.00 = 8,662,500.00
------------------------------------------------------------------------------------------------------------
Total Structural Cost 8,662,500.00
============================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------
Angel ECM Suite 750,000 750,000.00
C3 Computer (Master) 1,500,000 (+) 1,500,000.00 = 2,250,000.00
ER PPC (C) 300,000 (+) 300,000.00 = 2,550,000.00
Gauss Rifle (C) 300,000 (+) 300,000.00 = 2,850,000.00
Gauss Rifle (C) 300,000 (+) 300,000.00 = 3,150,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 3,150,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 3,150,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 3,150,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 3,150,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 3,150,000.00
Gauss Rifle (Ammo 8) [Empty Bin] (C) 0 (+) 0.00 = 3,150,000.00
------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 3,150,000.00
============================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------
Structural Cost 8,662,500.00
Weapons and Equipment Cost (+) 3,150,000.00 = 11,812,500.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 23,625,000.00
------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 23,625,000.00
|