Cost Breakdown
Name/Model: Behemoth C
Technology: Inner Sphere
Tonnage: 100
Configuration: Tracked Combat Vehicle
=========================================================================================================
Structural Cost
---------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (317 pts) 16.0 x 25,000 400,000.00
Internal Structure (Standard) 10.0 x 10,000 (+) 100,000.00 = 500,000.00
Control Components 5 x 10,000 (+) 50,000.00 = 550,000.00
Engine (XL) (20,000 x 300 x 100) / 75 (+) 8,000,000.00 = 8,550,000.00
Heat Sinks (Single) 10 x 2,000 (+) 20,000.00 = 8,570,000.00
Turret 3 x 5,000 (+) 15,000.00 = 8,585,000.00
---------------------------------------------------------------------------------------------------------
Total Structural Cost 8,585,000.00
=========================================================================================================
Weapons and Equipment Cost
---------------------------------------------------------------------------------------------------------
C3 Computer (Master) 1,500,000 1,500,000.00
CASE 50,000 (+) 50,000.00 = 1,550,000.00
MML 7 105,000 (+) 105,000.00 = 1,655,000.00
MML 7 105,000 (+) 105,000.00 = 1,760,000.00
MML 7 105,000 (+) 105,000.00 = 1,865,000.00
MML 7 105,000 (+) 105,000.00 = 1,970,000.00
MML 7 (Ammo 14) [SRM] [Empty Bin] 0 (+) 0.00 = 1,970,000.00
MML 7 (Ammo 14) [SRM] [Empty Bin] 0 (+) 0.00 = 1,970,000.00
MML 7 (Ammo 17) [LRM] [Empty Bin] 0 (+) 0.00 = 1,970,000.00
MML 7 (Ammo 17) [LRM] [Empty Bin] 0 (+) 0.00 = 1,970,000.00
MML 7 (Ammo 17) [LRM] [Empty Bin] 0 (+) 0.00 = 1,970,000.00
MML 7 (Ammo 17) [LRM] [Empty Bin] 0 (+) 0.00 = 1,970,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 2,270,000.00
Snub-Nose PPC 300,000 (+) 300,000.00 = 2,570,000.00
---------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 2,570,000.00
=========================================================================================================
Combat Vehicle Cost
---------------------------------------------------------------------------------------------------------
Structural Cost 8,585,000.00
Weapons and Equipment Cost (+) 2,570,000.00 = 11,155,000.00
Combat Vehicle Cost Multiplier 1 + (100 / 100) (*) 2 = 22,310,000.00
---------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 22,310,000.00
|