Cost Breakdown
Name/Model: Patton Tank (Clanner Taurian)
Technology: Inner Sphere (Mixed)
Tonnage: 65
Configuration: Tracked Combat Vehicle
====================================================================================================================
Structural Cost
--------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (267 pts) 13.5 x 25,000 337,500.00
Internal Structure (Standard) 6.5 x 10,000 (+) 65,000.00 = 402,500.00
Control Components 3.5 x 10,000 (+) 35,000.00 = 437,500.00
Engine (XL) (20,000 x 325 x 65) / 75 (+) 5,633,333.33 = 6,070,833.33
Turret 1.5 x 5,000 (+) 7,500.00 = 6,078,333.33
--------------------------------------------------------------------------------------------------------------------
Total Structural Cost 6,078,333.33
====================================================================================================================
Weapons and Equipment Cost
--------------------------------------------------------------------------------------------------------------------
ER Medium Pulse Laser (C) 150,000 150,000.00
LB 20-X AC (C) 600,000 (+) 600,000.00 = 750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 750,000.00
LB 20-X AC (Ammo 5) [Cluster] [Empty Bin] (C) 0 (+) 0.00 = 750,000.00
LRM 5 (C) 30,000 (+) 30,000.00 = 780,000.00
LRM 5 (Ammo 24) [Empty Bin] (C) 0 (+) 0.00 = 780,000.00
Targeting Computer (C) 3 x 10,000 (+) 30,000.00 = 810,000.00
--------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 810,000.00
====================================================================================================================
Combat Vehicle Cost
--------------------------------------------------------------------------------------------------------------------
Structural Cost 6,078,333.33
Weapons and Equipment Cost (+) 810,000.00 = 6,888,333.33
Combat Vehicle Cost Multiplier 1 + (65 / 100) (*) 1.65 = 11,365,750.00
--------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 11,365,750.00
|