Cost Breakdown
Name/Model: Gossamer TU (Fiend II "Pit") F2-3ND-P
Technology: Inner Sphere
Tonnage: 25
Configuration: VTOL Combat Vehicle
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Heavy Ferro-Fibrous) (89 pts) 4.5 x 25,000 112,500.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 137,500.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 152,500.00
Rotors 2.5 x 40,000 (+) 100,000.00 = 252,500.00
Engine (Light Fusion) (15,000 x 110 x 25) / 75 (+) 550,000.00 = 802,500.00
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 802,500.00
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Light PPC 150,000 150,000.00
PPC Capacitor 150,000 (+) 150,000.00 = 300,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 500,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 500,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 510,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 520,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 530,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 530,000.00
===============================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost 802,500.00
Weapons and Equipment Cost (+) 530,000.00 = 1,332,500.00
Combat Vehicle Cost Multiplier 1 + (25 / 30) (*) 1.833 = 2,442,472.50
-------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 2,442,473.00
|