Cost Breakdown
Name/Model: Gossamer TU (Fiend II) F2-3ND
Technology: Inner Sphere
Tonnage: 25
Configuration: VTOL Combat Vehicle
===============================================================================================================================
Structural Cost
-------------------------------------------------------------------------------------------------------------------------------
Armor (Standard) (72 pts) 4.5 x 10,000 45,000.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 70,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 85,000.00
Rotors 2.5 x 40,000 (+) 100,000.00 = 185,000.00
Engine (XL) (20,000 x 160 x 25) / 75 (+) 1,066,666.67 = 1,251,666.67
-------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 1,251,666.67
===============================================================================================================================
Weapons and Equipment Cost
-------------------------------------------------------------------------------------------------------------------------------
Light PPC 150,000 150,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 350,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 350,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 360,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 370,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 380,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 390,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 400,000.00
-------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 400,000.00
===============================================================================================================================
Combat Vehicle Cost
-------------------------------------------------------------------------------------------------------------------------------
Structural Cost 1,251,666.67
Weapons and Equipment Cost (+) 400,000.00 = 1,651,666.67
Combat Vehicle Cost Multiplier 1 + (25 / 30) (*) 1.833 = 3,027,505.00
-------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 3,027,505.00
|