Cost Breakdown
Name/Model: Gossamer TU (Fiend) F1-3ND
Technology: Inner Sphere
Tonnage: 25
Configuration: VTOL Combat Vehicle
==============================================================================================================================
Structural Cost
------------------------------------------------------------------------------------------------------------------------------
Armor (Standard) (56 pts) 3.5 x 10,000 35,000.00
Internal Structure (Standard) 2.5 x 10,000 (+) 25,000.00 = 60,000.00
Control Components 1.5 x 10,000 (+) 15,000.00 = 75,000.00
Rotors 2.5 x 40,000 (+) 100,000.00 = 175,000.00
Engine (Fusion) (5,000 x 110 x 25) / 75 (+) 183,333.33 = 358,333.33
------------------------------------------------------------------------------------------------------------------------------
Total Structural Cost 358,333.33
==============================================================================================================================
Weapons and Equipment Cost
------------------------------------------------------------------------------------------------------------------------------
Light PPC 150,000 150,000.00
RISC Advanced Point Defense System 200,000 (+) 200,000.00 = 350,000.00
RISC Advanced Point Defense System (Ammo 12) [Empty Bin] 0 (+) 0.00 = 350,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 360,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 370,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 380,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 390,000.00
Vehicular Grenade Launcher 10,000 (+) 10,000.00 = 400,000.00
------------------------------------------------------------------------------------------------------------------------------
Total Weapons and Equipment Cost 400,000.00
==============================================================================================================================
Combat Vehicle Cost
------------------------------------------------------------------------------------------------------------------------------
Structural Cost 358,333.33
Weapons and Equipment Cost (+) 400,000.00 = 758,333.33
Combat Vehicle Cost Multiplier 1 + (25 / 30) (*) 1.833 = 1,390,025.00
------------------------------------------------------------------------------------------------------------------------------
Final Combat Vehicle Cost 1,390,025.00
|